Checklists
Your opening checklist is a laminated sheet on a clipboard. You find out it wasn't done when something has already gone wrong.
A photo of the paper sheet, a PDF, a spreadsheet, an SOP or a ready pack — AI drafts it in Arabic and English. Or build it by hand.
Runs open at every branch on their schedule, or someone starts one now. A late run alerts the branch manager, then head office — and can open a follow-up.
Readings against their range, photos and signatures. A critical fail needs a note and a photo, and opens a follow-up by itself.
Every completion is chained, so a later edit shows. Hand over a signed PDF packet with a 72-hour link and a QR code.