For multi-branch restaurants, cafés and cloud kitchens
The one placeyour day runs from.
Checklists, inspections, follow-ups and tomorrow's order — every branch in one place, in Arabic, on the phone.
No credit card · Free for one branch · Built in Riyadh and Amman
Good evening, Tariq
Six branches · today, at a glance
Checks today
96%Open follow-ups
1Tomorrow’s orders
5 of 6Today’s checks, as they happen
- 06:12OlayaOpening checks done
- 09:30MalqaPrep checks done
- 11:02OlayaChiller 9.2°C · follow-up opened
- 14:15NakheelReceiving check done
- 16:40RabwahBatch cooling check done
- 21:47OlayaClosing checks sealed
Smart Ordering
Due to order today · 6 branches
Lines suggested
42Avg confidence
93%Urgent lines
2Rabwah · tomorrow
Draft readyChicken thigh, boneless
48 kgFresh milk
120 LTahini
8 tinsChecklists
Today · 6 branches · 3 templates live
Done today
17 of 18Overdue
1Awaiting sign-off
2Opening checklist
3 of 4 doneQuality
SFDA profile · Halal mode on
Inspections this week
12Critical fails
1Average score
91%Store inspection · Olaya
Head office2 follow-ups opened
Scheduling
Week of Sep 14 · 6 branches
Shifts assigned
84Swap requests
2Clocked in now
19Week of Sep 14
No work-rule conflictsKhalid · food-safety training lapsed — Thursday can’t be assigned
Labels
Kitchen printers · 6 branches
Recipes
38Printers online
5 of 6Allergens
14Hummus
حمص
- Prepped
- Sep 14 · 10:20
- Use by
- Sep 16 · 10:20
Contains: sesame
Olaya · batch B-0914
From the recipe · shelf life 48h
Kitchen printer · Olaya
Work Orders
Work orders · priority from how important the equipment is
Open
13Late
2Avg time to fix
1.8 daysWalk-in fridge running warm
Repair · Critical · Olaya
Quarterly HVAC filter swap
Maintenance · Malqa
Espresso machine — slow flow
Sami · since 09:10
Follow-ups
Opened automatically · resolved here
Open
1Awaiting close
2Closed (30d)
14Hood filter skipped 4 nights — Sweifieh
Prep chiller 9.2°C — Olaya
CriticalFrom Checklists · opened automatically
Due today · 14:00
Documents
SOPs, recipes and policies · versioned
Documents
38Signatures due
2In review
2Allergen handling SOP
v3 · updated Sep 2
Gates step 6 of the closing checklist
Illustration of the product: the owner’s overview across six branches beside a phone on the floor where a 9.2°C chiller reading has opened a follow-up automatically.
A shift on Mihwar
See a day happen.
Four moments, four apps — and nobody had to remember.
- 06:12
Opening checks, on the phone
- 11:02
9.2°C — a follow-up opens itself
- 16:40
Tomorrow’s order, filled in for you
- 21:47
Shift sealed. The inspector’s link is one tap.
The eight apps
Eight apps. One operation.
Quality
Scored inspections by the branch or head office — every problem becomes a follow-up.
Checklists
Every shift’s routine, ticked on the phone — and sealed.
Follow-ups
Follow-ups with an owner and a due time.
Smart Ordering
Drafts each branch’s next order from its own history.
Work Orders
Log the fault, assign the fix, keep the equipment’s history.
Documents
SOPs your team reads and signs — versioned.
Scheduling
Schedules that won’t staff lapsed training.
Labels
Prep and expiry labels straight from the recipe.
Inspections
Bring the form you use today.
Photograph the paper, upload the PDF or just describe the inspection. AI builds it in Arabic and English, and you check every item before it goes live.
A photographed paper form becomes a digital inspection in English and Arabic, then a scored report whose problems become follow-ups.
Your form — paper, PDF or Excel
Built by AI, in both languages
Scored — every problem a follow-up
One check, three apps
The rest happens on its own.
One failed check, and the right response in every app it touches.
Checklists
Prep chiller at 9.2°C — the step fails
Follow-ups
Opened · due within 24 hours
Work Orders
Work order opened for the equipment
Inspector record
Sealed · a link for the inspector in one tap
Three more chains work the same way
- The equipment’s manual is addedIts checks are drafted from it
- A critical step cites an SOPSigned before the step records
- Required training lapsesThe shift can’t be assigned
Daily summary and alerts
Know by nine. Hear it the moment it matters.
Every morning, the people who run branches get yesterday on one page, in their own language. A critical fail reaches them at once — in the app and by e-mail.
A morning e-mail sums up yesterday at each branch; the app’s notifications show a critical fail and a failed inspection the moment they happen.
Every morning — yesterday on one page
At once — in the app and by e-mail
Built for the region
Arabic first. Not translated.
Right-to-left on every screen, Hijri dates, and the inspection packs SFDA and Dubai Municipality actually ask for.
- RTL on every screen
- Hijri and Gregorian dates
- SFDA and Dubai Municipality packs
- English for HQ, Arabic for the floor
- The usual work rules for Saudi Arabia, the UAE and Jordan
- Hajj and Umrah leave, Ramadan hours
Check us, don't trust us
Check it yourself.
We are early, and would rather say so. Instead of logos you cannot check, here is something you can break.
Six inspection packs ship ready — SFDA, Dubai Municipality and JFDA among them — with the regulators’ limits built in
- SFDA daily food safety (KSA)
- Dubai Municipality Food Watch
- JFDA daily food safety (Jordan)
- HACCP CCP monitoring
- Halal operations
- Ramadan operations
An ISO 22000 profile is included, and any step’s limits can be set to your own.
Ready to stop guessing?
Start with the checks your branches run every shift — and bring the whole operation into one app.